SHAR / INDUSTRIAL

Industrial video across live action and CGI

Facility filming and CGI for equipment with technical review, access rules and delivery versions defined in one scope.

  • METHODLive action / CGI / hybrid
  • CONTROLAccess / facts / review gates
  • BUDGETfrom RUB 900,000
PUBLIC INDUSTRIAL WORKM-TECHNO ↗

01 / MATERIAL

Published production context without invented outcomes

The M-Techno film confirms available material and production context; it does not transfer its brief or results to another project.

02 / QUICK ANSWERS

What to define before the script

Access conditions, operating reality and approved technical facts determine whether the film uses live action, CGI or both.

When should we film?

Use live action to show people, scale, working conditions and the real operating sequence.

When should we use CGI?

Use CGI for hidden mechanisms, inaccessible stages or a precise explanation of how equipment works.

Who approves facts?

A designated client technical reviewer confirms terminology and process accuracy.

What defines the estimate?

Access, the shot list, CGI scope, rights and delivery versions define the estimate.

03 / METHOD CHOICE

Choose the method by evidence access

A single film can combine live action, CGI and motion where the evidence requires it.

Method Job Control
Live action People and operations Access and safety
CGI Mechanisms and hidden stages CAD and review
Hybrid Facility plus digital layer Tracking and composite
Motion Diagrams and data Terminology

04 / CONTROL

Production controls for facility work

Access, safety, technical review and delivery are agreed before production.

Access

Approved zones and filming windows.

Safety

Induction, PPE and facility rules.

Facts

Terminology and operating sequence.

Delivery

Master file and approved versions.

05 / SCOPE AND ESTIMATE

Access, CGI and rights share one estimate

Reviews happen before expensive output.

BUDGET

From RUB 900,000

Access, filming, model readiness, CGI shots and versions drive the estimate.

FACTS / SAFETY

The client confirms both

SHAR does not invent engineering facts; the facility defines safety and confidentiality.

HANDOFF / PARTNERSHIP

Only listed files transfer

Models and project files are not automatic.

Production partnership, white-label, NDA and international work are agreed in advance.

06 / QUESTIONS

Before industrial filming or CGI

Method, access, accuracy, estimate and delivery.

When should we film a facility and when should we use CGI?

Live action fits real people, scale and operating processes. CGI fits internal mechanisms, hidden stages, unavailable equipment and controlled technical explanation. A hybrid film can combine both.

Which technical inputs are needed?

Drawings, CAD, process diagrams, equipment references, approved terminology, access rules and a responsible technical reviewer form the initial evidence set.

How are safety and access handled?

Facility requirements take priority. The client defines induction, PPE, restricted zones, confidentiality, operating windows and which actions may be filmed.

How much does industrial video cost?

The published starting guide is RUB 900,000. The estimate follows access, shoot scope, model readiness, CGI shots, review gates, rights and delivery versions.

Who approves technical accuracy?

A designated client specialist approves terms, sequence, geometry, interfaces and process claims. SHAR does not invent engineering facts.

Can SHAR work under NDA or white label?

Yes. SHAR can work directly or as an agency production partner. Client contact, credits, confidentiality, approvals and handoff are agreed before production.

Which versions can be delivered?

The scope can include a master, shorter edits, subtitles, presentation files and formats for sites or exhibition screens. Source and project files are not transferred automatically.

Technical details

08 / START A PROJECT

Send the task and access rules

Include the facility, channels, timing, available evidence and technical reviewer.

About this page

Author and creator: SHAR Production. Published: . Modified: .

Approve technical accuracy in an industrial film

Industrial visualisation should explain equipment or a process without unintended distortion. Engineers and marketers assess different aspects: construction accuracy and clarity of communication. Separate those approvals before detailed animation and final rendering.

Assembly geometry. Verification source: Model, drawing or verified photographs. Approval point: Before materials and complex lighting.

Mechanism behaviour. Verification source: Sequence description and permitted states. Approval point: At the motion schematic or animatic stage.

Specifications. Verification source: Approved specification with units. Approval point: Before values enter graphics or narration.

Illustrative cutaways. Verification source: A record of hidden or simplified elements. Approval point: Before final scene assembly.

CGI can reveal inaccessible views, but realistic appearance does not establish physical accuracy. Identify simplifications and have a responsible client expert approve technical claims. Production working files and the public film may disclose different levels of technical information.

Discussing an industrial video project in Moscow

SHAR Production's Moscow contact point at 12 Krasnopresnenskaya Embankment is used for meetings by appointment. It is not an owned soundstage. When filming is needed, a rented or partner location is selected for the project. For an industrial CGI film, we check technical sources, equipment structure and motion before producing scenes. See the Moscow production context in Russian for project-planning details.

Can work start without a 3D model?

Model-building feasibility and scope depend on drawings, photographs and product access. Missing dimensions or construction details cannot be reliably recovered from one attractive reference; clarify them before visualisation.

Commission industrial 3D animation with a verifiable explanation

Choose the viewer’s technical question

An equipment film may explain construction, a process sequence or the role of a specific component. Define the question each sequence answers. Distinguish a real visible feature from an explanatory convention such as a cutaway, flow, temperature or hidden movement. A convention is useful when viewers understand its limits.

Identify the source for important movements

Drawings establish geometry, but may not establish how a mechanism operates. Animation needs states, movement direction and interactions. Name the technical approver and the source-document versions. A design change after approval can affect the model, shots and labels; treat it separately from a visual revision.

Review technical accuracy and presentation separately

First check the explanation against the product data, then assess readability and pacing. Exhibition playback needs a viewing-distance and loop plan; a presentation may need pauses at specific stages. An estimate should account for cutaways, unique mechanisms, labels, languages and versions. These decisions describe the work more precisely than runtime alone.