SHAR / VIDEO PRODUCTION

Full-cycle video production for brands and agencies

SHAR produces commercial, brand and product video. The brief fixes the audience, message, channels and versions; the scene plan assigns live action, CGI or AI, followed by post-production and delivery.

  • FORMATLive action / CGI / AI / hybrid
  • SCOPEConcept → approved files
  • DELIVERYMaster and channel versions
SHOWREEL 2026Watch · 00:49

01 / THE WORK

Start with the frame. Then inspect the production system.

Showreel 2026 brings together commercial films, live action, CGI, AI and hybrid scenes. It is a concise view of SHAR's visual range, followed by detailed public cases.

Open the showreel case
SHAR Production Showreel 2026 coverSHAR PRODUCTIONSHOWREEL 2026 · 00:49

03 / THE METHOD

Match the method to the risk in each shot

A project may use one method or several. We compare frame control, product accuracy, the need for real people and the number of adaptations rather than choosing a technique for novelty.

MethodBest used whenWhat needs control
Live actionReal people, environments, interviews and physical behaviour carry the messageCasting, locations, light, shoot days, rights and schedule
CGI / 3DExact geometry, materials, pre-launch products or impossible cameras are requiredModels, textures, physics, rendering and product tolerances
AI videoStylised worlds, visual exploration and directed generative scenes fit the briefContinuity, artifacts, rights, brand safety and selection
HybridHuman credibility, product precision and visual freedom are needed togetherOne direction, key frames, compositing, colour and transitions
Motion designInterfaces, data, systems and graphic explanation are centralNarrative logic, pacing, legibility and sound rhythm

A short brief is enough to compare methods. For the generative route, read the separate guide to AI video production.

04 / THE CYCLE

Production review points

The exact sequence changes with the project and is fixed before production. Live action, CGI, AI and post-production are assigned only where they contribute to the agreed result.

  1. 01

    Task and boundaries

    Audience, message, channels, duration, deadline, available assets and approval criteria.

  2. 02

    Concept and script

    Idea, narrative, references, key frames, script and the planned set of versions.

  3. 03

    Pre-production and production

    Shoot preparation, scene creation, CGI or AI tests and production of the approved material.

  4. 04

    Post-production

    Editing, graphics, compositing, colour, sound, artifact cleanup and approvals.

  5. 05

    Delivery

    Master, cutdowns, channel formats, subtitles and final files defined by the estimate.

The next stage starts after approval of the task and constraints; concept, script and key frames; production tests; first edit; and the master/version map. The approval owner and acceptance criteria for each gate belong in the project schedule.

05 / THE SCOPE

Make deliverables, cost drivers and timing visible

A useful estimate exposes the work, versions, rights and handoff instead of compressing the project into a single unexplained line.

DELIVERABLES

Files for real channels

The scope can include a master film, short edits, horizontal or vertical versions, subtitles, graphics, sound variations and agreed channel files.

The estimate lists music, stock, contributors, territory, usage period and channels. Source material and project files are included only when named in the handoff.

BUDGET

The estimate follows the scene plan

Cost depends on duration, scenes, shoot days, cast, locations, CGI or AI work, music, rights, schedule and versions.

Published starting points are RUB 300,000 for a compact AI format, RUB 900,000 for a commercial film, RUB 1,200,000 for classic production and RUB 1,800,000 for a hybrid project. Each figure belongs to a defined scope, not a fixed package. See the Pricing.

SCHEDULE

Timing follows the production map

Concept work, preparation, filming or scene creation, post-production, approvals and deliverables shape the calendar. After the brief, a preliminary schedule maps the stages, approval dates, dependencies on client material and delivery of each version.

How to compare video production proposals

CompareWhat the proposal should showWhy it matters
ScopeScript, preparation, live action or digital scenes, post-production and soundThe same service label can hide a different amount of work
Team and ownershipWho produces, directs, accepts material and runs approvalsResponsibility for each decision and stage is visible
RightsMusic, stock, contributors, territory, usage period and channelsThe licence must match the real release plan
Versions and handoffMaster, cutdowns, formats, subtitles, source material and project filesThe delivery package cannot remain implied
Approval gatesCheckpoints, approval owner and acceptance criteriaRevisions and the schedule stay manageable

07 / THE TEAM

For brands, B2B teams and product companies

SHAR records the message, approval chain, available assets and release channels before estimating the scene plan. Briefing and approvals can run remotely; filming logistics are planned for the approved locations.

FOR AGENCIES

White-label full-cycle production and NDA

Roles, credits, communication and the handoff model are agreed before production. SHAR can work as a visible partner or behind the agency relationship.

Discuss the working model

08 / QUESTIONS

Before the production starts

Scope, method, timing, deliverables, agency collaboration and the inputs for a preliminary estimate.

What does full-cycle video production include?

The scope can include the brief, concept, script, pre-production, filming or scene creation, CGI or AI development, editing, graphics, colour, sound and agreed channel versions. The estimate defines which stages are included.

How is a video production budget estimated?

Budget depends on the format, duration, number of scenes, filming days, cast, locations, CGI or AI complexity, music, rights, schedule and final versions. SHAR prepares a preliminary range after the brief; published format guidance is available on the pricing page.

How long does production take?

Timing depends on concept development, preparation, filming or scene creation, post-production, approvals and the number of deliverables. A project calendar is prepared with the proposed scope.

How do we choose between filming, CGI and AI?

Filming is useful for real people and environments, CGI for exact products and controlled digital scenes, and AI for directed generative imagery. A hybrid route combines them when one method cannot carry the whole job.

Which video versions can be delivered?

The delivery can include a master film, shorter edits, horizontal or vertical formats, subtitles, graphics, sound variations and files prepared for the agreed channels. Source materials are included only when specified in the contract.

Can SHAR work with agencies under NDA or white-label?

Yes. Production-partner, white-label and NDA arrangements are possible. Roles, credits, communication and handoff are agreed before production starts.

What is needed for a preliminary estimate?

Send the product context, audience, objective, channels, desired duration, deadline, available brand materials and references. This is enough to compare production methods and outline the first scope.

10 / NEXT STEP

Inputs for the first production scope

Product context, audience, channels, desired duration, deadline and available assets are enough to begin. The response will outline a production scope, estimate structure, schedule and version map.

About this page

Author and creator: SHAR Production. Published: . Modified: .