SHAR / PRODUCTION ESTIMATE

Video production pricing by scope

Six starting points show the likely budget level for common formats. Choose the closest one; after the brief we will confirm the scenes, timing, rights and deliverables and prepare a preliminary estimate.

  • GUIDES6 verified formats
  • ESTIMATEtask / scope / rights
  • STARTbrief / source material
PUBLIC PRODUCTION RANGESHOWREEL 2026 ↗

01 / METHOD CHOICE

Six verified starting points

Each guide belongs to the stated scope and does not replace a final estimate.

Format / guide What is included Details
AI video
from RUB 300,000
Directed generation, edit, sound and agreed versions. AI production ↗
Commercial video
from RUB 900,000
Concept, production, post-production and versions. Commercial ↗
TV commercial with AI / CGI
from RUB 950,000
Additional graphics, frame control and placement scope. TV format ↗
Hybrid production
from RUB 1,800,000
Live action, AI, CGI and post allocated by scene. Hybrid ↗
Classical production
from RUB 1,200,000
Crew, set, directing, edit, colour and sound. Full cycle ↗
Creative development
from RUB 250,000
Concept, story framework and visual direction. Creative ↗

Not included automatically. Media placement, travel, talent and voiceover, music and stock, additional languages and versions, source files and project files are listed separately when the project requires them.

02 / QUICK ANSWERS

Four rules for reading budget guides

Scope comes before a production number.

Is this a package?

No. Each figure is a guide for a described scope, not a universal quotation.

What matters beyond runtime?

Scenes, method, access, team, versions, reviews, licences and rights.

Is AI always cheaper?

No. Iterations, consistency and artefact correction also create production work.

When does the planning estimate need to be revised?

When scenes, method, access, source material, versions, languages, timing, rights or the review path change.

03 / MATERIAL

A frame shows production work, not its estimate

Public work confirms production methods and execution range. Its budget, timing and commercial outcome are not transferred to a new brief or inferred from an image.

04 / CONTROL

Four estimate layers

A useful comparison keeps the same assumptions across proposals.

Task and scenes

Audience, message, runtime and unique-scene map.

Method and access

Live action, AI, CGI, 3D, locations, people, product and source assets.

Post and versions

Edit, colour, graphics, sound, languages, ratios and channels.

Rights and reviews

Music, stock, models, territory, usage period and approval owners.

05 / SCOPE AND ESTIMATE

A planning range and a final estimate are different documents

Production planning is separated from contractual scope.

ESTIMATE

Scope before the number

Runtime is one factor; a film or series is estimated from its actual production design.

A planning guide does not replace the final estimate.

HANDOFF

Rights and files are listed

Masters, versions, licences, source material and project files are defined in the estimate and contract.

Models, projects and third-party material are not automatic.

AGENCY / INTERNATIONAL

Roles are fixed before estimating

Production-partner, white-label and NDA work can keep client contact inside the agency.

International contracts, payment and English-language material are agreed for the project.

06 / QUESTIONS

Questions about production pricing

Guides, estimate logic, methods, versions, rights and handoff.

Is a published figure a fixed package price?

No. Each figure is a planning guide for a defined scope. The final estimate follows the brief, production method, deliverables, timing and rights.

What usually enters a production estimate?

The estimate can cover creative development, script, preparation, filming, AI, CGI, 3D, editing, colour, sound, versions, logistics, licences and usage rights.

Is AI always cheaper than live action?

No. AI iterations, consistency control, artefact correction, editing and rights can make a scene more demanding than expected. The route follows the task and required control.

Does duration determine the price?

Duration matters, but scene count, production method, access, people, assets, review gates, versions and rights can be more important than the final runtime.

Can the scope be reduced?

Sometimes fewer scenes, locations, languages or versions and usable source material can reduce work. Each change is checked against the main task and delivery requirements.

When is a detailed estimate prepared?

A planning range can follow the initial brief. A detailed estimate requires checked inputs, a defined production method, deliverables, timing, rights and approval responsibilities.

Are source and project files included in the estimate?

Masters and agreed versions are listed in the scope. Source material, 3D models, licences and project files transfer only when the estimate and contract include them.

Can SHAR work with agencies and international teams?

Yes. Production-partner, white-label, NDA, English-language material, international contracts and payment, client contact, credits and publication are agreed before production.

08 / START A PROJECT

Send the task and known constraints

From the inputs, we define the production approach and a planning range, then list the questions and materials needed for the final estimate.

About this page

Author and creator: SHAR Production. Published: . Modified: .